Nambiar District 25 Phase 2
Sarjapur Road, Bangalore
₹1.72 – 4.13 Cr₹13,800/sq ft
Nambiar District 25 Phase 2 review — Sarjapur Road, Bangalore
Nambiar District 25 Phase 2 is a apartment project by Nambiar Builders at Sarjapur Road, Bangalore. spread across 8.61 acres with 816 units in 6 towers (G+34). at roughly 95 units/acre with 85% open space. Possession is scheduled for August 2030.
Project brochure
Brochures leave out the things you need to check
Deep-Dive RERA Report
Builder financials, the 15 agreement clauses and title risks, taken from the project's RERA filings
See a sample report →Key facts
Configurations & pricing
| Type | Price | Saleable | Carpet |
|---|---|---|---|
| 2BHK | ₹1.72 Cr | 1245 sq ft | 809 sq ft |
| 2.5BHK | ₹2.01 Cr | 1454 sq ft | 965 sq ft |
| 3BHK | ₹2.34 Cr | 1695 sq ft | 1124 sq ft |
| 3BHK | ₹2.62 Cr | 1896 sq ft | 1196 sq ft |
| 3BHK | ₹2.82 Cr | 2046 sq ft | 1303 sq ft |
| 4BHK | ₹3.53 Cr | 2561 sq ft | 1649 sq ft |
| 4BHK | ₹4.13 Cr | 2995 sq ft | 1958 sq ft |
Indicative pricing from PropVision property database. Contact us for the current price sheet.
Floor plans (7)
Floor plans from the PropVision property database. Verify final unit plans with the builder.
Location & livability
Air Quality Index 35 (pm10 dominant, PM2.5 33.42 µg/m³) · Noise: Very Quiet
Amenities (10)
Specifications
Flooring
| Item | Used in | Notes |
|---|---|---|
| Ceramic Flooring | Low-traffic areas | Most affordable but least durable |
| Vitrified Tiles | Living areas, bedrooms | Better than ceramic – more durable and stain-resistant |
| Wooden Textured | Living areas, bedrooms, balconies | More stylish than ceramic/vitrified with warm aesthetics |
| Marble | Premium spaces | More luxurious than vitrified but requires more maintenance |
| Kota Stone | Multi-purpose areas | Natural stone that's durable and cost-effective; better than ceramic |
| Anti-Skid Tiles | Toilets, wet areas, balconies | Superior to regular tiles for safety in wet areas |
Doors & Windows
| Item | Used in | Notes |
|---|---|---|
| Engineered Wood | Internal doors | Better stability and durability than plain flush doors |
| UPVC Sliding Door | Balconies, exteriors | Superior insulation & sound-proofing vs aluminium |
| Aluminium Sliding Glass | Balconies | Less expensive than UPVC but inferior insulation |
| Aluminium + Mosquito Mesh | Balconies, exteriors | Better than standard aluminium for pest protection |
| Polished Teak Wood | Main doors | Most premium natural option – better aesthetics than engineered wood |
| Timber with Lamination | Internal doors | Better moisture resistance than plain wood |
| Hardwood with PU Coating | External/internal doors | Excellent durability, better than uncoated options |
Paint
| Item | Used in | Notes |
|---|---|---|
| Plastic Emulsion | Interior walls | Basic washable paint, entry-level option |
| Acrylic Emulsion | Interior/exterior | Superior to plastic – better durability & colour retention |
| Textured Paint | Feature walls, exts | Better than flat paints for hiding imperfections |
| Tile Cladding | Exteriors | Most durable exterior option, superior to paint for longevity |
| Oil-Bound Distemper | Budget interiors | Most economical but inferior to emulsions |
Others
| Item | Used in | Notes |
|---|---|---|
| Construction Technology | Mivan Construction | |
| Sanitary Fittings | Not Specified |
Legal approvals & clearances
Statutory approvals on record — a key due-diligence signal for buyers.
- verifiedKhata — Approved by BBMP [document]
- verifiedDevelopment Plan — Approved by BDA [document]
- verifiedBuilding Plan — Approved by BBMP [document]
- verifiedWater NOC — Approved by BWSSB [document]
- verifiedPollution Board NOC — Approved by MOEF [document]
- verifiedHeight NOC — Approved by HAL/AAI [document]
- verifiedFire NOC — Approved by KSFESD [document]
- verifiedCity Development Plan — Available [document]
- verifiedLegal Opinion — Available [document]
- verifiedDevelopment Rights — Available [document]
Frequently asked questions
What is the price of Nambiar District 25 Phase 2?expand_more
Nambiar District 25 Phase 2 is priced from approximately ₹1.72 Cr to 4.13 Cr, across its 2.5BHK, 2BHK, 3BHK, 4BHK configurations at Sarjapur Road. The project's average rate is around ₹13,800/sq ft.
What configurations and sizes does Nambiar District 25 Phase 2 offer?expand_more
Nambiar District 25 Phase 2 offers 2BHK (1245 sq ft saleable, 809 sq ft carpet); 2.5BHK (1454 sq ft saleable, 965 sq ft carpet); 3BHK (1695 sq ft saleable, 1124 sq ft carpet); 3BHK (1896 sq ft saleable, 1196 sq ft carpet); 3BHK (2046 sq ft saleable, 1303 sq ft carpet); 4BHK (2561 sq ft saleable, 1649 sq ft carpet); 4BHK (2995 sq ft saleable, 1958 sq ft carpet).
When is the possession date for Nambiar District 25 Phase 2?expand_more
Nambiar District 25 Phase 2 by Nambiar Builders is scheduled for possession in August 2030.
How spacious and low-density is Nambiar District 25 Phase 2?expand_more
Nambiar District 25 Phase 2 has a density of about 95 units/acre over 8.61 acres (816 units across 6 towers), with 85% open space.
Is Nambiar District 25 Phase 2 a good investment?expand_more
At ₹13,800/sq ft, Nambiar District 25 Phase 2 is priced above the Sarjapur Road market average of ₹11,378/sq ft. Locality investment potential is rated 'Medium'.
Explore more
Get the full Nambiar District 25 Phase 2 price sheet & floor plans
Talk to a PropVision advisor — no brokerage, unbiased.
✓ No spam calls · ✓ Unbiased advice · ✓ Zero brokerage
Home loan
See what EMI you're eligible for — without touching your credit score
Personalised offers from 33+ lenders in minutes, on a soft check that leaves your score exactly where it is.
Your CIBIL score stays untouched
Soft check only. One hard check later, at the lender you pick.
33+ lenders, priced to your profile
The rate you're shown is the rate you get.
No paperwork, no spam calls
PAN and Aadhaar to start. Statements pull from netbanking.
Opening your application in a new tab — we'll call you if you need help.
Under-construction, resale and balance transfers. Checked by our lending partner Zoop Money — final rate and sanction are the lender's decision, not ours.
Ask Sachi — AI property expert
Deep-dive answers about Nambiar District 25 Phase 2, instantly on WhatsApp.





